Construction planner engineer
Pubblicato il 14-08-2026 - Mcdermott International in Milano
PpJob Overview: The construction planning engineer will be responsible for supporting the operations for construction planning in the home office for site execution works. They are required to have experience of AWP activities and work processes on site for execution. Our ingenuity fuels daily life. Together, we’ve forged some of the most trusted partnerships across the energy value chain to make what was once just an idea a reality: laying subsea infrastructure thousands of feet below sea level, installing platforms hundreds of miles from shore, using our expertise to design and build offshore wind infrastructure, and reshaping the onshore landscape to deliver the energy products the world needs safely and sustainably. For more than 100 years, we've been making the impossible possible. Today, we’re driving the energy transition with more than 30,000 of the brightest minds across 54 countries. /ph3Essential Qualifications and Education /h3ulliBachelor’s degree in Engineering or Construction Management, or equivalent5 to years of experience in construction /liliModerate knowledge of MDR construction procedures, progress systems, material management systems, document management, and timekeeping systems /liliKnowledge of MS Office skills, specifically with Excel, and Access /liliExcellent attention to detail and proven ability to meet deadlines, troubleshoot, and resolve issues /liliRespected for uncompromising integrity, work ethic, and professionalism /liliEnergetic with a positive and enthusiastic disposition, possessing a can-do attitude /liliProject-focused, values-oriented, and results-driven#LI-JA1 /li /ulh3Key Tasks and Responsibilities /h3ulliCoordinate with the Completions Manager on discipline activity /liliCoordinate with Site QA/QC Manager on final inspection and punch list,
red-line drawings to show as-build conditions /liliPerform engineering activities to develop/complete design /liliPrepare/answer Request for Information and Field Work Order Requests /liliSupervise the Site Document Management Department and ensure that project personnel adhere to correspondence and filing system guidelines /liliFacilitate preparation of drawings for special construction equipment, scaffolds, workstations, and construction aids /liliArrange for procurement, fabrication, and installation of the required items /liliManage Engineering support on the site through the Project Manager at the home office /liliThere will be specific times that Engineering support will be required on the site to assist in acceptance or checkout /liliManage all correspondence concerning questions or issues between Engineering and Construction through a Request for Information (RFI) system for document tracking and control /liliClose out all RFIs and incorporate them into the turnover systems for care and custody of the Client /liliCapture progress daily in Work Face Planning software from information provided by Foremen/General Foremen /liliAnalyze daily progress and schedule performance /liliConduct weekly planning meetings with their Superintendents to determine work to be executed in the upcoming three weeks /liliGenerate weekly work plans on an IWP level with General Foremen/Superintendents’ direct input and record them in the Work Face Planning system /liliRequest material by submitting WRFIs by IWP to material management before the execution date and track material delivery /liliInterface with the Construction Supervisor, Project Controls, and subcontractors to facilitate updates to the 3 WLA and WWP Record and communicate Lessons Learned captured on IWPs /li /ulpFull timePosting Date: /p /p #J-18808-Ljbffr
