Commissioning Planner

01 ott - Milano
ISS International

pISS International Spa è alla ricerca di un Commissioning Engineer in modalità mista: 60% da remoto e i restanti 40% in presenza presso gli uffici di Milano.
/p h3Main Tasks: /h3 ul lipDevelop, update, and maintain the commissioning schedule in alignment with engineering, construction, pre-commissioning, commissioning, start-up, and handover milestones.
/p /li lipSupport the Commissioning Manager to define the commissioning planning logic based on systems, subsystems, areas, disciplines, priorities, constraints, and execution sequence.
/p /li lipPrepare Level 3 and Level 4 commissioning schedules, look-ahead plans, progress curves, and recovery plans when required.
/p /li lipCoordinate with Commissioning, Construction, Engineering, Procurement, Subcontractors, Vendors, Project Controls, and Operations to collect inputs and validate schedule feasibility.
/p /li lipMonitor progress against the baseline schedule, identify delays, critical path impacts, bottlenecks, and propose mitigation or acceleration actions.
/p /li li pSupport systemization activities by ensuring that planning data is structured by system, subsystem, area, discipline, and handover priority.
/p /li lipTrack commissioning deliverables development, including procedures, work packs, check sheets, test records, dossiers, certificates, and handover packages.
/p /li lipPrepare weekly and monthly reporting packages, including dashboards, S-curves, KPIs, manpower histograms, progress summaries, and management presentations.
/p /li lipCoordinate planning interfaces between Mechanical Completion, Pre-Commissioning, Commissioning, Start-Up, Performance Testing, and final handover.
/p /li lipSupport manpower planning,



resource forecasting, productivity analysis, vendor mobilization planning, and temporary equipment planning.
/p /li lipParticipate in commissioning planning meetings, readiness reviews, progress reviews, schedule risk reviews, and coordination meetings.
/p /li lipEnsure that commissioning activities are properly planned in line with specific HSE requirements, permit-to-work constraints, SIMOPS, LOTO, operational restrictions, and site access limitations.
/p /li lipProvide planning input for client reporting, contractual discussions, internal reviews, schedule impact assessments, and commissioning risk management.
/p /li /ul h3Tools: /h3 ul lipPlanning and scheduling tools: Primavera P6, Microsoft Project, or equivalent scheduling software for baseline schedules, updates, critical path analysis, look-ahead plans, and recovery plans.
/p /li lipProgress monitoring and reporting tools: Microsoft Excel, Power BI, project dashboards, S-curves, KPI trackers, and progress measurement templates for weekly and monthly reporting.
/p /li lipData analysis and control tools: Excel databases, pivot tables, Power Query, Power BI, and schedule/progress export files for data validation, trend analysis, and reporting automation.
/p /li lipEngineering and systemization tools: PIDs, SLDs,



layouts, system/subsystem lists, commissioning item lists, equipment lists, marked-up drawings, and commissioning databases.
/p /li /ul h3Requisiti: /h3 ul lipBachelor of Science Degree in an Engineering Discipline (Preferably Chemical or Mechanical) /p /li lip5 Years of experience in the Oil Gas Industry /p /li lipMinimum of 2,5 Years experience as Commissioning Planner /p /li /ul pDi seguito ulteriori dettagli: /p pInizio attività: Ottobre **** /p pLuogo di lavoro: Milano /p pDurata: 1 anno rinnovabile /p ul libOrario di lavoro: /b full time in presenza, con calendario operativo di cantiere da confermare e possibile attività anche il sabato in base alle esigenze progettuali /li libTipologia contrattuale: /b assunzione a tempo determinato presso ISS International S.p.A. /li libCCNL applicato: /b CISAL Terziario Commercio /li libRetribuzione iniziale / fascia retributiva prevista: /b RAL indicativa compresa tra b€****** e €****** /b.
Sono inoltre previsti eventuali trattamenti accessori connessi alla trasferta e/o alla mobilità sul territorio, ove applicabili, secondo le condizioni contrattuali, fiscali e organizzative previste per il progetto.
/li /ul pLa retribuzione e gli eventuali trattamenti accessori saranno definiti sulla base di esperienza, competenze, inquadramento applicabile e criteri oggettivi e neutri rispetto al genere.
/p pISS International S.p.A. promuove pari opportunità e un processo di selezione improntato a criteri di trasparenza, oggettività e non discriminazione.
La ricerca è rivolta a candidati e candidate in possesso dei requisiti indicati.
/p #J-*****-Ljbffr

Addetti/e vendita reparto ortofrutta pt 24h fiorano modenese

04 ott - Italia
Altro

Addetto/a Area Qualità Alimentare

04 ott - Italia
Adecco

Ricevi nuove offerte di lavoro

Crea una Job Alert gratuita per commissioning planner / milano

Venditore Intralogistica

04 ott - Italia
Kion Group

Tecnico Officina Carrelli Elevatori: Diagnosi

04 ott - Italia
KION Business Services Polska