15 ott - Napoli
Bristol Companies
h3Posting Details /h3 ul liPosted on September 14, 2026 /li /ul h3Locations /h3 ul liShowing 1 location FPO, AE, FN 09621, USA /li liOn-site /li liConstruction /li liFull-Time /li liRequisition #: CONST /li /ul h3Description /h3 pbJob Summary /b /p pThe Scheduler provides independent, professional planning, scheduling, analysis, and schedule-risk support to NAVFAC EURAFCENT projects supporting NSA Naples, NSA Bahrain, and additional EURAFCENT locations. This role develops, analyzes, validates, and presents planning, design, and construction schedules for Navy shore facility types and ensures compliance with NAVFAC standards. /p pBristol Alliance of Companies (Bristol) is committed to building lasting relationships that reflect our hard work, ingenuity, and dedication to safety. Every employee has an impact on our success, which benefits the Native Culture, land, and people of the Bristol Bay region. /p pOur values: People, Communities, Reputation, Teamwork, Trust, and Truth. /p pbEssential Functions /b /p ul liPrepare and/or analyze planning, design,
and construction schedules for diverse Navy facility types including housing, waterfront structures, medical facilities, administrative buildings, utilities, hangars, industrial facilities, command centers, and power plants. /li liRecommend reasonable construction durations for RFP/solicitation packages considering operational constraints, outages, secured area escorts, environmental permitting, and ancillary project interfaces. /li liDevelop Basis of Schedule (BoSE) documentation and present schedule durations to Government stakeholders and leadership. /li liReview A/E-prepared schedule durations and propose adjustments based on constraints and conditions. /li liParticipate in Cost Schedule Risk Analysis (CSRA) activities. /li liServe as a non-voting technical member of Technical Evaluation Teams (TET) when schedule submissions are evaluated. /li liAnalyze contractor cost-loaded Network Analysis Schedules (NAS), includ
15 ott - Casier
Michael Page
15 ott - Milano
QuiCare
15 ott - Roma
Lvmh Group
15 ott - Chieti
VINCI Energies Italia