18 ott - Napoli
Bristol Companies
Posting Details
- Posted on September 14, 2026
Locations
- Showing 1 location FPO, AE, FN 09621, USA
- On-site
- Construction
- Full-Time
- Requisition #: CONST001874
Description
Job Summary
The Scheduler provides independent, professional planning, scheduling, analysis, and schedule-risk support to NAVFAC EURAFCENT projects supporting NSA Naples, NSA Bahrain, and additional EURAFCENT locations. This role develops, analyzes, validates, and presents planning, design, and construction schedules for Navy shore facility types and ensures compliance with NAVFAC standards.
Bristol Alliance of Companies (Bristol) is committed to building lasting relationships that reflect our hard work, ingenuity, and dedication to safety. Every employee has an impact on our success, which benefits the Native Culture, land, and people of the Bristol Bay region.
Our values: People, Communities, Reputation, Teamwork, Trust, and Truth.
Essential Functions
- Prepare and/or analyze planning, design, and construction schedules for diverse Navy facility types including housing,
waterfront structures, medical facilities, administrative buildings, utilities, hangars, industrial facilities, command centers, and power plants.
- Recommend reasonable construction durations for RFP/solicitation packages considering operational constraints, outages, secured area escorts, environmental permitting, and ancillary project interfaces.
- Develop Basis of Schedule (BoSE) documentation and present schedule durations to Government stakeholders and leadership.
- Review A/E-prepared schedule durations and propose adjustments based on constraints and conditions.
- Participate in Cost Schedule Risk Analysis (CSRA) activities.
- Serve as a non-voting technical member of Technical Evaluation Teams (TET) when schedule submissions are evaluated.
- Analyze contractor cost-loaded Network Analysis Schedules (NAS), including critical path updates and delay impacts.
- Collaborate with FEAD/ROICC representatives and pro
19 ott - Casamassima
Società riconosciuta
19 ott - Massa
Azienda riconosciuta
19 ott - Roma
Gruppo importante
19 ott - Felino
Azienda importante