Pubblica annuncio gratuito
Ricevi nuove offerte di lavoro

Crea una Job Alert gratuita per construction scheduler / napoli

Construction Scheduler

Pubblicato il 28-10-2026 - Bristol Companies in Napoli

Posting Details

- Posted on September 14, 2026

Locations

- Showing 1 location FPO, AE, FN 09621, USA
- On-site
- Construction
- Full-Time
- Requisition #: CONST

Description

Job Summary

The Scheduler provides independent, professional planning, scheduling, analysis, and schedule-risk support to NAVFAC EURAFCENT projects supporting NSA Naples, NSA Bahrain, and additional EURAFCENT locations. This role develops, analyzes, validates, and presents planning, design, and construction schedules for Navy shore facility types and ensures compliance with NAVFAC standards.

Bristol Alliance of Companies (Bristol) is committed to building lasting relationships that reflect our hard work, ingenuity, and dedication to safety. Every employee has an impact on our success, which benefits the Native Culture, land, and people of the Bristol Bay region.

Our values: People, Communities, Reputation, Teamwork, Trust, and Truth.

Essential Functions

- Prepare and/or analyze planning, design, and construction schedules for diverse Navy facility types including housing, waterfront structures, medical facilities, administrative buildings, utilities, hangars, industrial facilities, command centers, and power plants.
- Recommend reasonable construction durations for RFP/solicitation packages considering operational constraints, outages, secured area escorts, environmental permitting, and ancillary project interfaces.
- Develop Basis of Schedule (BoSE) documentation and present schedule durations to Government stakeholders and leadership.
- Review A/E-prepared schedule durations and propose adjustments based on constraints and conditions.




- Participate in Cost Schedule Risk Analysis (CSRA) activities.
- Serve as a non-voting technical member of Technical Evaluation Teams (TET) when schedule submissions are evaluated.
- Analyze contractor cost-loaded Network Analysis Schedules (NAS), including critical path updates and delay impacts.
- Collaborate with FEAD/ROICC representatives and provide schedule training and review guidance.
- Provide schedule duration analysis and review comments at NAVFAC design milestones (35%, 65%, 100%).

- Other duties as assigned.

Competencies

- Skilled in written and oral communication, including technical correspondence and schedule narratives.
- Ability to analyze complex construction schedules and identify critical path shifts.
- Strong analytical and problem-solving abilities.
- Ability to work collaboratively with diverse engineering and construction teams.
- Skilled in Primavera P6, Claim Digger, MS Project, MS Office Suite, and Adobe Acrobat Professional.
- Ability to interpret construction drawings, contract documents, and Federal building criteria.

Required Education and Experience

- Bachelor’s degree in engineering, Engineering Technology,



or Construction Management and a minimum of 5 years of scheduling experience; OR 10 years of scheduling experience without a qualifying degree.
- Experience scheduling construction projects valued at $25M or greater.
- Proficiency with Primavera P6 and Claim Digger.
- Experience analyzing cost-loaded NAS schedules and performing time-impact analysis.
- Active Secret Clearance required.
- Valid driver’s license.

Preferred Education and Experience

- Experience supporting Federal or DoD facilities construction projects.
- Familiarity with NAVFAC processes and Unified Facilities Criteria (UFC).
- Experience delivering schedule-related training.

Work Environment

The work environment characteristics described here are representative of those an employee encounters while performing the essential functions of this job. Reasonable accommodation may be made to enable individuals with disabilities to perform the essential functions.

- Position may be subject to both inside and outside environmental conditions, noise sufficient to cause the worker to shout.
- Position may be subject to a variety of physical conditions – proximity to moving mechanical parts, moving vehicles, electric current, working on scaffolding and high places, exposure to high heat or exposure to chemicals.
- Position may be subject to atmospheric conditions – fumes, odors, dusts, mist, gases, or poor ventilation.
- Position may be subject to close visual acuity to perform activities such as viewing a computer terminal and extensive reading.

Physical Qualifications

The physical demands described here are representative of those that must be met by an employee to suc

» RISPONDI A QUESTO ANNUNCIO
Altri Annunci
Remote Backend Engineer for AI Agent Systems
2026-10-29 01:19:20 - Outlier - Milano
Outlier is seeking OpenClaw Agent Builders to help shape the future of autonomous agents. This freelance, remote role offers compensation up to $50 USD/hr with weekly payments and flexible scheduling. Candidates sh [...]
Addetto/a alle vendite
2026-10-29 01:19:19 - ACTION - Vanzaghello
Action è il discount non alimentare con la crescita più rapida in Europa. Abbiamo iniziato la nostra attività con un piccolo punto vendita in Olanda nel 1993 ed oggi la nostra azienda è cresciuta diventando un'o [...]
Ricevi nuove offerte di lavoro

Crea una Job Alert gratuita per construction scheduler / napoli

Remote AI Agent Engineer — Freelance, Flexible Schedule
2026-10-29 01:19:09 - Outlier - Genova
Outlier helps the world’s most innovative companies improve their AI agents by providing human feedback. Do you want to shape the future of autonomous agents like OpenClaw? We collaborate with leading AI organizat [...]
Promoter in Parafarmacia: Promozione Integratori Memoria
2026-10-29 01:19:09 - Ottosunove - Vicenza
OTTOSUNOVE è alla ricerca di un Promoter in parafarmacia per gestire una giornata promozionale assegnata. Il candidato illustrerà le caratteristiche degli integratori alimentari per la memoria e cercherà di susci [...]