Commissioning Planner

Pubblicato il 19-11-2026 · Società riconosciuta · Italia

ISS International Spa è alla ricerca di un Commissioning Planner in modalità ibrida: 60% da remoto e i restanti 40% in presenza presso gli uffici di Milano.

Main Tasks:

- Develop, update, and maintain the commissioning schedule in alignment with engineering, construction, pre-commissioning, commissioning, start-up, and handover milestones.

- Support the Commissioning Manager to define the commissioning planning logic based on systems, subsystems, areas, disciplines, priorities, constraints, and execution sequence.

- Prepare Level 3 and Level 4 commissioning schedules, look-ahead plans, progress curves, and recovery plans when required.

- Coordinate with Commissioning, Construction, Engineering, Procurement, Subcontractors, Vendors, Project Controls, and Operations to collect inputs and validate schedule feasibility.

- Monitor progress against the baseline schedule, identify delays, critical path impacts, bottlenecks, and propose mitigation or acceleration actions.

- Support systemization activities by ensuring that planning data is structured by system, subsystem, area, discipline, and handover priority.

- Track commissioning deliverables development, including procedures, work packs, check sheets, test records, dossiers, certificates, and handover packages.

- Prepare weekly and monthly reporting packages, including dashboards, S-curves, KPIs, manpower histograms, progress summaries, and management presentations.

- Coordinate planning interfaces between Mechanical Completion, Pre-Commissioning, Commissioning, Start-Up, Performance Testing, and final handover.

- Support manpower planning, resource forecasting, productivity analysis,



vendor mobilization planning, and temporary equipment planning.

- Participate in commissioning planning meetings, readiness reviews, progress reviews, schedule risk reviews, and coordination meetings.

- Ensure that commissioning activities are properly planned in line with specific HSE requirements, permit-to-work constraints, SIMOPS, LOTO, operational restrictions, and site access limitations.

- Provide planning input for client reporting, contractual discussions, internal reviews, schedule impact assessments, and commissioning risk management.

Tools

- Planning and scheduling tools: Primavera P6, Microsoft Project, or equivalent scheduling software for baseline schedules, updates, critical path analysis, look-ahead plans, and recovery plans.

- Progress monitoring and reporting tools: Microsoft Excel, Power BI, project dashboards, S-curves, KPI trackers, and progress measurement templates for weekly and monthly reporting.

- Data analysis and control tools: Excel databases, pivot tables, Power Query, Power BI, and schedule/progress export files for data validation, trend analysis, and reporting automation.

- Engineering and systemization tools: P&IDs;, SLDs, layouts, system/subsystem lists,



commissioning item lists, equipment lists, marked-up drawings, and commissioning databases.

Requisiti

- Bachelor of Science Degree in an Engineering Discipline (Preferably Chemical or Mechanical)

- 5 Years of experience in the Oil & Gas Industry

- Minimum of 2,5 Years experience as Commissioning Planner

Di seguito ulteriori dettagli:

Inizio attività: Luglio 2026

Luogo di lavoro: Milano

Durata: 1 anno rinnovabile

• Orario di lavoro: tempo pieno in presenza, con calendario operativo di cantiere da confermare e possibile attività anche il sabato in base alle esigenze progettuali
• Tipologia contrattuale: assunzione a tempo determinato presso ISS International S.p.A.
• CCNL applicato: CISAL Terziario Commercio
• Retribuzione iniziale / fascia retributiva prevista: RAL indicativa compresa tra €25.000 e €35.000. Sono inoltre previsti eventuali trattamenti accessori connessi alla trasferta e/o alla mobilità sul territorio, ove applicabili, secondo le condizioni contrattuali, fiscali e organizzative previste per il progetto.

La retribuzione e gli eventuali trattamenti accessori saranno definiti sulla base di esperienza, competenze, inquadramento applicabile e criteri oggettivi e neutri rispetto al genere.

ISS International S.p.A. promuove pari opportunità e un processo di selezione improntato a criteri di trasparenza, oggettività e non discriminazione. La ricerca è rivolta a candidati e candidate in possesso dei requisiti indicati.

Se interessato/a, invia la candidatura o condividi l’annuncio con la tua rete professionale.
Max. 8 MB. Formati Accettati: PDF, RTF, DOC, DOCX, ODT.